|
|
|
||
[1] Learning Witness Manual, 1998, Lanner Group, Inc.
[2] Witness Manufacturing Workbook
[3] Manufacturing Performance Edition Tutorial Manual Poslední úprava: ROZ437 (29.05.2012)
|
|
||
1. Management process modelling, methodology of decision situation models design
2. Simulation models, basic elements of simulation models
3. Random processes, their quantification in simulation models
4. Main areas of simulation models implementation in material and financial flows
5. Application of spreadsheets for simulation modelling
6. Directed graphs, Petri nets
7. Optimization processes in simulation models
8. Simulation software Witness
9. Basic simulation elements for simulation models design in Witness environment
10. Formulation of rules for control of modelled flows, WCL language
11. Communication environment of Witness, connections with enterprise information systems
12. Optimization tools, creation of summary reports
13. Case studies, short-term planning, service processes, prognostic models
14. Application of simulation model in technological processes optimization Poslední úprava: ROZ437 (29.05.2012)
|
|
||
Aim of subject is to give basic information about simulation approach to project management tasks mainly in logistics. During the lessons students will be work on projects which deals with real problems from basic areas of logistics such as transportation, storage and manufacturing. A tool used to find optimal solution will be software product Witness combined with data analysis in MS Excel environment. Poslední úprava: ROZ437 (29.05.2012)
|
|
||
Requirements: Necessary:
advanced level of knowledge of MS Excel � statistical analysis, pivot tables, filters, basic functions basic level of knowledge of Visual Basic � Macros Advanced:
basic level of knowledge of quantitative methods: MILP, MINLP, CPM, queuing theory, transportation task, stockkeeping theory basic level of knowledge of logistics: transportation, storage, manufacturing systems, DBR, JIT, Kanban basic knowledge of management: project management, time management Poslední úprava: ROZ437 (29.05.2012)
|